News/Blog

AutoDesk Specialization Designation

CaddFX receive … read more

Date Added: 29/06/2012

CaddFX Launches New Site

CaddFX is plea … read more

Date Added: 29/06/2012
e-Training LOGIN

In order to login and get started you will need to contact CaddFX, sign up for your class, and then CaddFX will set you up with a User name and Password to gain access to the training portal.

Hardware Products Authorized Reseller

CaddFX Blog

University Hospitals has a great organization and continues to grow, which is a good thing in this economy for us at CaddFX Design Services. And they like most organizations under these positive circumstances have several floor plans of the space they own or lease, however, they were either out of date or never received the final As-built condition drawings once construction was completed.

As-Built drawings are often not available, but when many organizations negotiate or need new space, this is when As-Built floor plans are needed. These are utilized for space planning, test-fitting, and many other purposes. When this becomes a...

CaddFX Design services As-Built services were solicited by ASI Modulex, for the purpose of creating Evacuation Maps. ASI is a very large sign company, and they provide a variety a variety of signs for commercial buildings. ASI was hired by Cleveland Public Libraries to provide signage placards, which would house the Evacuation Maps.

At CaddFX Design Services, we conducted As-Built services of (1) Corporate building and (33) Branch Libraries, which consisted of 550,000+ sq ft. The project began with us working directly with the Library’s archive department to research what floor plans they had on file for the Corporate Library, as...

Posted by in As-Built Case Studies .

CaddFX was contracted for the As-Built services at the residence located at Hudson, OH. The residence consisted of three floors, which totaled more than 20,000 sq. ft. Our services were requested between the Architect and Owner due to the large amount of changes that occurred during construction and to reduce any unnecessary change orders.

As we began the onset of this As-built project, we reviewed original electronic construction documents provided by the architect. We found the drawings did not follow the industry layering guidelines by AIA, which we also updated.

The mansion residence exterior construction was near 95%...